Internal construction of two upper floor frames that were @680m2 per floor frame. Required to be engineered to fit within the original buildings structural pylons.

Commercial

Experienced engineers. Great customer service. Timely delivery. Fantastic product. Exactly what the project needed to get off the ground, literally.

With an internal warehouse space of 38m Wide x 18m Deep x 8m High, Spantec engineered and delivered two upper floor frames to convert the original internal warehouse space. The frames could not impede on the original buildings concrete pylons nor dig into the building cement slab. This was engineered and delivered on time and on budget with minimum fuss.