Kit Systems - (Designed Floor System)
Ground Floors
Upper Floors
Mezzanine Floors
Commercial Floors
Boxspan – Beams (Floors)
Brackets – Floor
Colorbeam – Beams (Roofs)
Boxspan – Beams (Roofs)
Brackets- Roof
EZIDECK
Custom design decks
Deck Estimator
GET A QUOTE
Roof Frames
Ezipier
Ezibrace
NCC requires min. 400mm clearance where termite inspection is required. On sloping sites min. ground clearance may be less if inspection is still able to be completed.
Refer to NCC or your builder in all instances.
-or- Get a quote
Click to share